Porto Sul is a new open access, deep water port proposed to be constructed and built north of the existing port of Ilhéus in Bahia, Brazil.

Porto Sul will be an open access, deep water port dedicated to handling bulk commodities such as iron ore and, to a lesser extent, agricultural products. 

A Preliminary Licence (environmental) was granted in November 2012 for Porto Sul. Cabral understands the latest timetable for commissioning is 2016 to coincide with the FIOL rail line to be commissioned at the same time.

Porto Sul is designed to handle cape size vessels and will have a 3.5 kilometre jetty constructed out to deep Atlantic water for this purpose.

Cabral has signed a Protocol of Intentions with the State of Bahia which proposes rail and port allocations of up to 15.0mtpa of Cabral’s future iron ore products.

The images below show the design of the onshore port facilities and storage areas. Also shown is a picture of the actual onshore port location north of Ilhéus visited by Cabral which shows ample space for the designed layout.

 

Location & Design

Porto Location & Design
Source: Governo do Estado da Bahia, Casa Civil

 

Onshore

Porto Onshore
Source: Governo do Estado da Bahia, Casa Civil

 

 Offshore

Porto Offshore
Source: Governo do Estado da Bahia, Casa Civil

  

General Layout

General Layout

 

Conceptual Onshore Layout

Conceptual-Onshore-Layout

  

Conceptual Offshore Layout

Conceptual-Offshore-Layout

  

Onshore Structures to be built by the 5th year of the Project

Onshore-Structures-built-5th-year

  

Bridge, Pier and Breakwater to be finalised by the 5th year of the Project

 Bridge-Pier-and-Breakwater-5th-year

  

Profile of a Multi-User Terminal to be built by the 5th year of the Project

Profile-of-Multi-User-Terminal-5th-Year

  

Bridge, Pier and Breakwater to be built between the 15th and 18th years of the Project

Bridge-Pier-and-Breakwater-15-to-18-years

  

Profile of the Bridge to be built by the 5th year of the Project

 Profile-of-the-Bridge-5th-year

 

Profile of the Bridge to be built between the 15th and 18th years of the Project

 Profile-of-the-Bridge-15-to-18-years

 

  

 

Porto Photo